Paul W. Naus Jr. 570-752-4198
(Home) 717-439-3190
(Cell) E-mail
red65fastback@netzero.net PROFESSIONAL EXPERIENCE: September 2013 – PresentEngineering
Services/PPL PPL Corporate, Allentown, PA Primavera Scheduler (P6.v8.3) –
Fukushima Project/Design Engineering - New Modifications Ø Responsible for
maintaining the schedule to support the projects Ø Worked closely
with Design Engineers to ensure accurate representation of work to be
accomplished Ø Worked closely
with the Modification Engineering group providing multiple schedules for
future plant modifications Ø Worked closely
with site Project Managers Ø Produced
results for special requests pertaining to the schedule Ø Provided
recommendations for a more accurate schedule Ø Sustained a
constant safety awareness Ø Contract
Employment June 2013 – September 2013BCP
Engineering ANO Nuclear Power Plant, London, AR Primavera Scheduler (P6) –
Fukushima Project Ø Inaugural
position Ø Responsible for
building and maintaining multiple schedules to support the project Ø Worked closely
with Design Engineers to ensure accurate representation of work to be
accomplished Ø Worked closely
with Lead Schedulers at Entergy Corporate to ensure cohesive schedules with
the fleet Ø Worked closely
with site Project Managers Ø Produced
results for special requests pertaining to the schedule Ø Attended
multiple scheduling meetings/conference calls Ø Provided
recommendations for a more accurate schedule Ø Sustained a
constant safety awareness Ø Contract
Employment July 2012 – May 2013Aerotek/GE
Energy Turbine Manufacturing Facility
Schenectady, NY Primavera Scheduler (P6.v8.2) –
For Turbine Development Ø Inaugural
position Ø Guided key personnel
on how a schedule should be constructed/updated Ø Worked very
closely with the Engineering Group designing and testing conceptual turbines Ø Built and
maintained P6 schedules as per the requirements of the team Ø Collaborated
with key personnel striving for the perfect schedule Ø Collaborated
with key personnel to transfer P6 schedules to the PLM program to produce
workorders Ø Wrote and lead
training classes for the Program (Project) Managers and schedulers to work
within P6 Ø Sustained a
constant safety awareness Ø Contract
Employment August 2011 – October
2011 Fenwick Project Management/Alstom Peach Bottom Atomic Power
Plant, PA Site Logistics Manager - For
Unit 3 Turbine Retrofit Ø Procured and
ensured that multimillion dollar components arrived, were inventoried and
staged Ø Working closely
with the Engineering Department to ensure that all components were properly
prepared for delivery to their designated location within the plant Naus Resume – Page 2 Ø Discussed and
implemented, with specialized sub-contractors, to ensure a timely, safe
delivery and removal of equipment Ø Oversaw
Operating Engineers, Ironworkers, Millwrights, Carpenters and Laborer crews Ø Attended
Scheduling and Planning meetings to ensure all groups involved were
coordinated to the desired end result Ø Sustained a
constant safety awareness Ø Contracted
Employment April 2011 – April 2011McCarl’s
PPL
Susquehanna Steam Energy Station, PA Primavera Scheduler (P5) - For
Unit 2 15 Refuel Outage Ø Assisted with
updating Earned Value reports using Primavera and NIMS Ø Attended
schedule update meeting to acquire information to make accurate updates Ø Sustained a
constant safety awareness Ø Contracted
Employment August 2010 – April 2011McCarl’s
PPL Montour Fossil Power Plant, PA Primavera Scheduler (P5) - For
three Outages and two projects at two locations Ø Worked directly
with the Engineering Department to produce and update the Unit 2 Mini Outage,
prepare and maintain the schedule for the Unit 1 Overhaul, a two month outage
and to produce the U2 forced outage schedule Ø Assisted with
the Coal Silo rebuild project schedule at Montour and Brunner Island plants Ø Coordinated
with client department heads to schedule new and modified any existing work
activities Ø Produced
scheduling and Resource Usage Profile reports as required or requested Ø Wrote a
Primavera tutorial for McCarl’s management Ø Sustained a
constant safety awareness Ø Contracted
employment December 2009 to June 2010
Penn Technical Staffing/McCarl’s PPL Montour Fossil
Power Plant, PA Primavera Scheduler (P5) - For
two Outages Ø Worked directly
with the Engineering Department to produce and update the schedule for the
Unit 1 Mini Outage and the Unit 2 Overhaul, a two month outage Ø Coordinated
with client department heads to schedule new and modified any existing work
activities Ø Produced
scheduling and Resource Usage Profile reports as required or requested Ø Sustained a
constant safety awareness Ø While laid off,
I attended the Primavera advanced course. (See Education Section below) Ø Contracted
employment June 2009 to October 2009
DP Staffing Services, LLC River Bend
Nuclear Power Plant, LA Primavera Scheduler (P6.2) – For
the Special Projects Group Ø Worked directly
with the Engineering Department and Special Projects Group to prepare and
maintain the schedule for the Security Upgrade Project mandated by the NRC Ø Working
directly with the Engineering Department and Special Projects Group, assisted
in building and maintaining a 10,000+ activity schedule for the Refuel 15
Outage Ø Coordinated
with client department heads to schedule new and modified any existing work
activities Ø Produced
scheduling reports as required or requested Ø Sustained a
constant safety awareness Ø Contracted
employment Naus Resume – Page 3 January 2009 to February 2009
Fenwick Project
Management
Converteam, Pittsburgh, PA Primavera Scheduler (P6.1) – For
a multi-billion dollar steel mill construction project Ø Worked directly
for Engineering and interacted with department heads from Manufacturing,
Onsite Construction and Project Manager Ø Coordinated
with client department heads to schedule new and modified any existing work
activities Ø Provided
guidelines for schedule updates from Sub-managers Ø Produced
scheduling reports as required or requested Ø Sustained a
constant safety awareness Ø Contracted
employment May 2008 to December 2008 Fenwick
Project Management Callaway Nuclear Power
Plant, MO Primavera Scheduler (P5) – For
the Special Projects Group Ø Worked closely
with the Engineering Department and interacted with Lead Contractor,
Major Modification Group Lead, Work Week Management and Project Planners Ø Maintained a
40,000+ activity Schedule Ø Enforced timely
input for schedule update Ø Scheduled new
and modified any existing work activities Ø Produced
scheduling reports as required or requested Ø Attended
multiple weekly scheduling and planning meetings Ø Assisted in
building, maintaining the schedule for the Refuel 15 Outage Ø Sustained and
demonstrated a constant safety awareness Ø Contracted
employment September 2007 to November 2007Absolute
Consulting Nescopeck,
PA / Navarre, FL Nuclear Power Industry
Recruiter – For multiple nuclear power plants and clients Ø Searched for,
interviewed and submitted candidates for specific job opportunities within
the nuclear power generation industry Ø Contacted
prospective employees by phone, mail and electronically Ø Ensured all
necessary paperwork was completed and issued to the correct departments Ø Followed-up
with employee after assignment had begun Ø Experimental
position June 2007 to August 2007
US Gypsum/Absolute Consulting
US Gypsum Stockton, CA February 2007 to June 2007
US Gypsum/Absolute Consulting US Gypsum Westlake/AMC, OH September 2006 to November 2006
US Gypsum/Absolute Consulting
US Gypsum Galena Park, TX Project Lead – For
storeroom consolidation Ø Initial occupant of position Ø Inspected work areas several
times per day to ensure no safety issues exist. If noted, correct
immediately Ø Provided direction to ensure that
the storeroom parts are catalogued, moved to proper location, labeled
correctly and entered into the database with little to no disruption to the
daily activities of the working plant Ø Revisited daily and weekly plans
and schedule with the team and client Ø Generated long range plans and
schedule to ensure work continuity Ø Provided training and guidance
where necessary for all aspects of the project for the team and client
personnel Ø Wrote procedures and training
aides as required specific to this project Ø Communicated with the client
Reliability Manager on daily progress and issues Naus Resume – Page 4 Ø Recommended operational
suggestions to the client for a smooth and timely completion of the project Ø Briefed Plant Manager weekly on
continuing progress Ø Ensured all personnel had
everything required to perform their duties safely and correctly Ø Sustained, demonstrated and
briefed daily the need for safety awareness Ø Contracted employment March 2006 to September 2006Department
of Labor/MTC
Red Rock Job Corps Center, PA Residential
Advisor (RA) – For young adults seeking a second chance Ø Provided
guidance and assisted 30 co-ed Job Corps students in daily activities Ø Aided students
with homework, assisted in resolving conflicts, mentored and responsible for
mountains of paperwork levied upon the RA’s by the center and the Department
of Labor Ø Ensured that
the dorm remained in excellent order, students arrived at scheduled
appointments on time and that students abide by the rules of the dorm and the
center Ø Protected
students by ensuring that all safety regulations were adhered to July
2003 to February 2006DEMCO/MDM ServicesYankee Rowe Nuclear Power Station, MA
Document Control Administrator
– For plant decommissioning Ø Initial
occupant of position Ø Established
filing system for easy retrieval of documents Ø Responsible for
Controlled and Uncontrolled documents, including procedures and work packages
associated with the project Ø Produced
routine reports and other departmental requested reports Ø Retrieved
requested documents to turn over to Federal, State and Local governing
agencies Ø Developed
historical analysis as well as completing last minute special detailed
reports for Management Ø This position
required close attention to detail Ø Sustained a
constant safety awareness Ø Contract
Employment March 2003 to July 2003Access
Capital Harrisburg, PA Sales – Sold first, second
and refinancing mortgages April 2001 to October 2002
Day & Zimmermann NPS, Inc. (D&Z)/Sun Technical Services
Indian Point I, II and III Nuclear Power Stations, NY
Assistant
Project Support Manager – Managed the Nuclear Projects Group February 2001 – April 2001 D&Z
NPS, Inc. PPL Susquehanna Steam Energy
Station, PA Civil
Planner – Planned scaffold and insulation work packages for the Unit 2 10th refuel outage July 2000 – February 2001Day
& Zimmermann NPS, Inc. (D&Z)
Lancaster, PA Union
Rates Coordinator - For nuclear and fossil electrical power
generation plants July 1997 – July 2000Day &
Zimmermann NPS, Inc. (D&Z)
Lancaster, PA
Resource Coordinator (Recruiter) - For nuclear and fossil electrical
power generation plants April 1997 – June 1997
NPS Energy Services, Inc. Indian
Point II Nuclear Power Station, NY Assistant
Project Support Manager - Contracted employment January 1997 – April 1997
NPS Energy Services, Inc. PPL Susquehanna Steam Energy
Station, PA Document
Control Clerk - Contracted employment Naus Resume – Page 5 August 1996 – October
1996 NPS Energy Services,
Inc. PPL Susquehanna Steam Energy Station, PA Document
Control Clerk - Contracted employment May 1994 – July 1996ORE-IDA
Foods
Bloomsburg, PA
Quality Assurance Technician June 1989 – April 1994SalesVarious
Industries MILITARY EXPERIENCE:United
States Air Force
Honorable Discharge Ø Computer Files
Maintenance (IT) Ø Aircraft
Maintenance Statistical Analyst Ø Aircraft Fuel
System Specialist (mechanic) Ø Squadron Safety
NCO EDUCATION: Ø Columbia-Montour
Area Vocational/Technical School (High School) – Major Curriculum –
Business - Major Vocation – Ornamental Horticulture/Floriculture Ø University of
Maryland through the Community College of the Air Force – Equivalent to a
four year degree in
Business Management Ø United States
Air Force – Supervisors Course, Resident Professional Military Education
(PME) I and II, Statistical
Technical School, various computer schools and Aircraft Fuel Systems
Specialist School. Ø Confined Space
Rescue, First Aid, CPR and Blood Born Pathogen trained Ø Primavera
advanced course on P6 version 7; Evans Technology, Roswell, GA --
Primavera Certified References Upon Request |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|